Difference between revisions of "Note displays in chart viewer as UNASSIGNED"
Jump to navigation
Jump to search
(Created page with 'The note needs to be assigned to a section within the chart viewer. This is done under TWAdmin > Chart Admin > Manage Sections. Next highlight the desired chart section from th…') |
|||
Line 1: | Line 1: | ||
The note needs to be assigned to a section within the chart viewer. This is done under TWAdmin > Chart Admin > Manage Sections. Next highlight the desired chart section from the box on the left. Check the box next to the unassigned chart item no the right and then click "Assign", then save. | The note needs to be assigned to a section within the chart viewer. This is done under TWAdmin > Chart Admin > Manage Sections. Next highlight the desired chart section from the box on the left. Check the box next to the unassigned chart item no the right and then click "Assign", then save. | ||
+ | |||
+ | |||
+ | ==Links== | ||
+ | Back to [[Application Troubleshooting]] |
Latest revision as of 15:32, 30 April 2018
The note needs to be assigned to a section within the chart viewer. This is done under TWAdmin > Chart Admin > Manage Sections. Next highlight the desired chart section from the box on the left. Check the box next to the unassigned chart item no the right and then click "Assign", then save.
Links
Back to Application Troubleshooting