Difference between revisions of "ConnectR Calendar Widget"
Jump to navigation
Jump to search
(Created page with "If you receiving the below issue when trying to open the Calendar widget in ConnectR, please try the two troubleshoots suggested below. File:ConnectR Calendar Widget.jpg ...") |
|||
Line 1: | Line 1: | ||
If you receiving the below issue when trying to open the Calendar widget in ConnectR, please try the two troubleshoots suggested below. | If you receiving the below issue when trying to open the Calendar widget in ConnectR, please try the two troubleshoots suggested below. | ||
− | [[File:ConnectR Calendar Widget.jpg]] | + | ::[[File:ConnectR Calendar Widget.jpg|700px]] |
+ | |||
* Make sure allow scriptlets is enabled. Follow steps below for assistance. | * Make sure allow scriptlets is enabled. Follow steps below for assistance. | ||
− | [[File:Internet Options.jpg]] | + | ::[[File:Internet Options.jpg|700px]] |
− | [[File:Allow Scriptlets.jpg]] | + | ::[[File:Allow Scriptlets.jpg|700px]] |
* If there are more than 180 days in the log for the interface, the calendar will not appear. The calendar URL is passed every day and it can't load due to too long of a URL. Have the client change the purge log days/hold log days to less than 180. | * If there are more than 180 days in the log for the interface, the calendar will not appear. The calendar URL is passed every day and it can't load due to too long of a URL. Have the client change the purge log days/hold log days to less than 180. |
Revision as of 19:35, 7 December 2011
If you receiving the below issue when trying to open the Calendar widget in ConnectR, please try the two troubleshoots suggested below.
- Make sure allow scriptlets is enabled. Follow steps below for assistance.
- If there are more than 180 days in the log for the interface, the calendar will not appear. The calendar URL is passed every day and it can't load due to too long of a URL. Have the client change the purge log days/hold log days to less than 180.