Difference between revisions of "ConnectR Calendar Widget"

From Galen Healthcare Solutions - Allscripts TouchWorks EHR Wiki
Jump to navigation Jump to search
(Created page with "If you receiving the below issue when trying to open the Calendar widget in ConnectR, please try the two troubleshoots suggested below. File:ConnectR Calendar Widget.jpg ...")
 
 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
If you receiving the below issue when trying to open the Calendar widget in ConnectR, please try the two troubleshoots suggested below.
+
If you're receiving the below issue when trying to open the Calendar widget in ConnectR, please try the two troubleshoots suggested below.
 +
 
 +
::[[File:ConnectR Calendar Widget.jpg|700px]]   
  
[[File:ConnectR Calendar Widget.jpg]]   
 
  
 
* Make sure allow scriptlets is enabled.  Follow steps below for assistance.
 
* Make sure allow scriptlets is enabled.  Follow steps below for assistance.
  
[[File:Internet Options.jpg]]
+
::[[File:Internet Options.jpg|700px]]
 +
 
 +
::[[File:Allow Scriptlets.jpg|700px]]
  
[[File:Allow Scriptlets.jpg]]
 
  
 +
* If there are more than 180 days in the log for the interface, the calendar will not appear. The calendar URL is passed every day and it can't load due to too long of a URL. Fix, change the purge log days/hold log days to less than 180.  Note, this will change the number of days messages last in the message log.
  
* If there are more than 180 days in the log for the interface, the calendar will not appear. The calendar URL is passed every day and it can't load due to too long of a URL. Have the client change the purge log days/hold log days to less than 180.
+
* Also make sure that http://localhost/ is not in trusted sites.

Latest revision as of 17:07, 6 December 2012

If you're receiving the below issue when trying to open the Calendar widget in ConnectR, please try the two troubleshoots suggested below.

ConnectR Calendar Widget.jpg


  • Make sure allow scriptlets is enabled. Follow steps below for assistance.
Internet Options.jpg
Allow Scriptlets.jpg


  • If there are more than 180 days in the log for the interface, the calendar will not appear. The calendar URL is passed every day and it can't load due to too long of a URL. Fix, change the purge log days/hold log days to less than 180. Note, this will change the number of days messages last in the message log.