*[[:File:New_World_HIE_On-boarding_Readiness_Questionnaire_with_Addendum.docx|New World HIE On-Boarding Readiness Questionnaire]]
 
*[[:File:New_World_HIE_On-boarding_Readiness_Questionnaire_with_Addendum.docx|New World HIE On-Boarding Readiness Questionnaire]]
 
*[[:File:New World HIE ADT Technical Design Document.docx| New World HIE ADT Technical Design Document]]
 
*[[:File:New World HIE ADT Technical Design Document.docx| New World HIE ADT Technical Design Document]]
*[[[[:File:New World HIE Sample CCDA Use Case.docx|New World HIE Sample CCDA Use Case]]
+
*[[:File:New World HIE Sample CCDA Use Case.docx|New World HIE Sample CCDA Use Case]]
  
 
=Lessons Learned=
 
=Lessons Learned=

Revision as of 15:08, 9 September 2016

Documents & Artifacts

Lessons Learned

Connectivity

Need a standardized, timely, and proven approach for testing and implementing VPNs and connectivity.

  • What type of connection will the participant be using?
  • VPNs should be completed prior to engaging participants for kick-off calls, so progress can be made without losing communication with participant
  • How many VPNs can be completed concurrently?
  • How many dedicated connectivity resources will the HIE have dedicated?
  • Which participants are ready to engage at what time?
  • Does HIE have a schedule in terms of building these VPN connections?
  • VPN connectivity to all HIE environments: Test, Stage, Prod

Kick Off Meetings with Net New Participants

The following should be complete prior to kick off call if possible:

  • Will participants be receiving information from HIE (outbound to participant)?
    • If so, what specs do they need to receive for each message type they plan to receive?
  • What types of interfaces will the participant be connecting to HIE (inbound from participant)?
  • System code for facility added to system and portal
  • If participant is sending ORUs:
    • Are all results LOINC Coded?
    • Understanding how OBR-4/OBX-3 is sent
    • Ensure corrections, cancellations work as participant expects, etc…
    • Proper handling of sensitive lab information/do they send it?
    • If sending radiology, will they be participating in an Image Exchange?
  • Interface Analyst Contact Information
    • Phone/email
  • UAT Contacts (Validators)
    • Phone/email
  • Test plan for UAT from participant?
    • If not, we need one
      • ADT – event type flow, testing all event types
      • ORU – testing cancellations, corrections (both OBR and OBX), testing microbiology results, testing pathology results
      • MDM – testing cancellations, corrections, etc…
  • Established timeline for go-live
    • Testing
    • UAT
    • Activation
    • Go-live issue resolution

Preparedness

  • Inbound Feeds
    • Version control – ensure interfaces are complete and thorough testing has occured prior to promoting them to production
    • Environment control – it’s important that all environments are the same, so any testing conducting in dev and test environments can be relied upon as sufficient
  • Outbound Feeds
    • Understand how they function, where input facility specific logic needs to be input, etc…

Documentation of Standards

  • Prefixes and Suffixes
  • PV1 Providers and Copy To Providers in OBR NTE Segments
  • OBX-3 is a copy of ‘OBR-4’ on RADs
  • Naming Conventions

User Acceptance Testing

  • Ensure that aesthetic formats and HL7 standards are met
    • OBR-4/OBX-3
    • PV1 Providers in NTE segments
    • Map OBR-4 to OBX-3 on RADs if OBX-3 is of no value
  • Follow Test Plans through each message type
    • Event types and message order
    • Cancellations and corrections
    • Microbiology messages and pathology messages
    • Sensitive Lab testing
    • Look for invalid characters
  • Create a schedule for validation in Stage, sign-off, validation in Prod, sign-off
    • Standardized process for HIE Validation
    • Standardized process for Participant UAT Validation
    • Standardized process for migration through environments

User Acceptance Criteria