MEDITECH 6.x Migration- Infrastructure and Planning

From Galen Healthcare Solutions - Allscripts TouchWorks EHR Wiki
Revision as of 17:53, 3 February 2016 by Susan.D'Agostino (talk | contribs) (Created page with "__TOC__ ==Introduction== There is a lot to consider when migrating from MAGIC or Client/Server (C/S) 5.X to MEDITECH's 6.x. Infrastructure requirements are an important compo...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Introduction

There is a lot to consider when migrating from MAGIC or Client/Server (C/S) 5.X to MEDITECH's 6.x. Infrastructure requirements are an important component of your migration journey. One thing to keep in mind, the MEDITECH C/S 6.x is a completely different HCIS and does process reports differently from MAGIC. Modifications will need to be made to ensure that reports are processed properly. The following will hopefully assist in some of the decisions needed to ensure a successful migration to 6.x

Basic Data Center Upgrade/Planning

Use strategic capacity planning to future-proof your data center's virtualization efficiency and make the most of server hardware. A reliable power supply is ensured via grid sectors, ensure basic principles and best practices of data center airflow management are in place.