Difference between revisions of "QRC: Solution-Services-Maintentance"

From Galen Healthcare Solutions - Allscripts TouchWorks EHR Wiki
Jump to navigation Jump to search
Line 6: Line 6:
  
 
* Provide access to all affected client servers both Electronic Health Record (Clinical Database server) and Practice Management Server inclusive of full Admin rights to server, application and databases.
 
* Provide access to all affected client servers both Electronic Health Record (Clinical Database server) and Practice Management Server inclusive of full Admin rights to server, application and databases.
* Provide server requirements required for Datamart and ETL set up/install based on required specifications per environment (See Appendix D)
+
* Provide server requirements required for Datamart and ETL set up/install based on required specifications per environment
 
* Provide ten (10) selected measures being tracked for quality reporting program.
 
* Provide ten (10) selected measures being tracked for quality reporting program.
 
* Provide current, existing documented workflows to support the ten (10) quality measures to be re-designed/configured.
 
* Provide current, existing documented workflows to support the ten (10) quality measures to be re-designed/configured.
Line 14: Line 14:
 
''' Galen Deliverables:'''
 
''' Galen Deliverables:'''
 
* Install and Implement- ETL from one (1) Electronic Health Record (EHR- Clinical Database and one (1) Practice Management (PM) system  
 
* Install and Implement- ETL from one (1) Electronic Health Record (EHR- Clinical Database and one (1) Practice Management (PM) system  
* Install and Implement- one (1) DataMart (see Appendix B- Technical Design Specification)
+
* Install and Implement- one (1) DataMart  
* Develop, Configure, and Implement Reporting Environment for ten (10) selected quality measures which includes (see Appendix C for reporting Life Cycle for QRC):
+
* Develop, Configure, and Implement Reporting Environment for ten (10) selected quality measures which includes  
 
* Measure Analysis and Scoring System- obtaining baseline data on clinical/administrative client data compared to quality measures metrics including numerator/denominator baselines
 
* Measure Analysis and Scoring System- obtaining baseline data on clinical/administrative client data compared to quality measures metrics including numerator/denominator baselines
 
* Reports on ten (10) quality measures for entire patient population by provider, patient, site/group, and organizational level
 
* Reports on ten (10) quality measures for entire patient population by provider, patient, site/group, and organizational level
* Pre-validated reports on ten (10) measures from data set of fifty (50) patients per measures with pass/fail report provided to [Client Name]
+
* Pre-validated reports on ten (10) measures from data set of fifty (50) patients per measures with pass/fail report provided to the client
 
* Complete a Gap Analysis/Remediation plan for ten (10) quality measures based on the QRC report
 
* Complete a Gap Analysis/Remediation plan for ten (10) quality measures based on the QRC report
 
* Weekly refresh of clinical and practice management in the datamart based on contract term length
 
* Weekly refresh of clinical and practice management in the datamart based on contract term length

Revision as of 19:05, 6 October 2015

Quality Reporting Compliance QRC: Solution/Services, Maintenance Overview

Quality Reporting Compliance Solution offering is targeted to clients who are currently participating or considering to participate in PQRS, ACO measures or similar type programs related to quality improvement. Client who may have multiple PM/EHR systems are in the middle of merger/acquisitions and/or undergoing conversions with data from multiple sources and are looking for a single source report to see all the required data in a single report to report/file and remediate workflow/training/configuration based on findings. This offering includes maintenance reporting weekly based on client’s reporting timeframe post implementation of the QRC Solution/Service

Client Responsibilities:

  • Provide access to all affected client servers both Electronic Health Record (Clinical Database server) and Practice Management Server inclusive of full Admin rights to server, application and databases.
  • Provide server requirements required for Datamart and ETL set up/install based on required specifications per environment
  • Provide ten (10) selected measures being tracked for quality reporting program.
  • Provide current, existing documented workflows to support the ten (10) quality measures to be re-designed/configured.
  • Participate in decision-making for workflow/configuration re-defining options for ten (10) quality measures, including clinical leadership as appropriate.
  • Complete QRC assessment questionnaire.

Galen Deliverables:

  • Install and Implement- ETL from one (1) Electronic Health Record (EHR- Clinical Database and one (1) Practice Management (PM) system
  • Install and Implement- one (1) DataMart
  • Develop, Configure, and Implement Reporting Environment for ten (10) selected quality measures which includes
  • Measure Analysis and Scoring System- obtaining baseline data on clinical/administrative client data compared to quality measures metrics including numerator/denominator baselines
  • Reports on ten (10) quality measures for entire patient population by provider, patient, site/group, and organizational level
  • Pre-validated reports on ten (10) measures from data set of fifty (50) patients per measures with pass/fail report provided to the client
  • Complete a Gap Analysis/Remediation plan for ten (10) quality measures based on the QRC report
  • Weekly refresh of clinical and practice management in the datamart based on contract term length

Timeline- Solutions-Services 2-3 months

  • Project timeline starts once all assigned Galen resources have access to the required environment as well as the technical environment set up completed as outlined in the Client Responsibility section.

Timeline- Maintenance

  • Project timeline for the Maintenance starts the first month following the project close out of the QRC initial solution/service has been completed. The weekly reports will occur on a regularly, scheduled day based on the clients determination.


More on Quality Reporting and Compliance (QRC)