Difference between revisions of "Rollout"

From Galen Healthcare Solutions - Allscripts TouchWorks EHR Wiki
Jump to navigation Jump to search
(Spreadsheet to calculate go-live resources and a description of the spreadsheet.)
Line 3: Line 3:
 
Field explanations
 
Field explanations
  
Number of Sites - Number of physical locations requiring resources
+
-Number of Sites - Number of physical locations requiring resources
Simultaneous Sites to Go-live - How many physical locations requiring resources will be going live at the same time
+
 
Week 1 Resources per Site - How many resources will be at each site week 1 of the go-live
+
-Simultaneous Sites to Go-live - How many physical locations requiring resources will be going live at the same time
Weeks of Post Live Support - The number of weeks that a site will be given post-live resources
+
 
# resources Left in Support role per site - The number of resources to support in the Post-live support
+
-Week 1 Resources per Site - How many resources will be at each site week 1 of the go-live
# resources to maintain pace - Calculation based on the above telling how many resources would be necessary to rollout with those criteria
+
 
Weeks to complete all sites - Calculation of how long it will take to cycle through all sites
+
-Weeks of Post Live Support - The number of weeks that a site will be given post-live resources
Resource cost per week - Variable defining the weekly cost in dollars for a go-live resource
+
 
Net Cost - Calculation based on the number of resources to maintain pace, weekly cost and number of weeks to maintain pace
+
-Number of resources Left in Support role per site - The number of resources to support in the  
 +
Post-live support
 +
 
 +
-Number of resources to maintain pace - Calculation based on the above telling how many resources would be necessary to rollout with those criteria
 +
 
 +
-Weeks to complete all sites - Calculation of how long it will take to cycle through all sites
 +
 
 +
-Resource cost per week - Variable defining the weekly cost in dollars for a go-live resource
 +
 
 +
-Net Cost - Calculation based on the number of resources to maintain pace, weekly cost and number of weeks to maintain pace
  
 
[[Image:Go-Live Resource Calculator.xls]]
 
[[Image:Go-Live Resource Calculator.xls]]

Revision as of 20:51, 26 July 2007

Working on rollout strategies we found it helpful to have a tool that would enable us to calculate the amount of resources necessary to support a given rollout strategy. Based on this, we created the attached spreadsheet. The spreadsheet is a great tool for estimating based on averages or resourcing a particular go-live. The sheet has the ability to calculate by number of sites or providers. The sides would be used seperately not at the same time.

Field explanations

-Number of Sites - Number of physical locations requiring resources

-Simultaneous Sites to Go-live - How many physical locations requiring resources will be going live at the same time

-Week 1 Resources per Site - How many resources will be at each site week 1 of the go-live

-Weeks of Post Live Support - The number of weeks that a site will be given post-live resources

-Number of resources Left in Support role per site - The number of resources to support in the Post-live support

-Number of resources to maintain pace - Calculation based on the above telling how many resources would be necessary to rollout with those criteria

-Weeks to complete all sites - Calculation of how long it will take to cycle through all sites

-Resource cost per week - Variable defining the weekly cost in dollars for a go-live resource

-Net Cost - Calculation based on the number of resources to maintain pace, weekly cost and number of weeks to maintain pace

File:Go-Live Resource Calculator.xls