Difference between revisions of "V11 Note"

From Galen Healthcare Solutions - Allscripts TouchWorks EHR Wiki
Jump to navigation Jump to search
Line 21: Line 21:
  
 
*However the base install of all the noteforms should be installed in Production.  Typically clients do NOT inactivate noteforms they have not tested, because this would limit the noteforms that are pulled into the note for symptom or problem-based forms.
 
*However the base install of all the noteforms should be installed in Production.  Typically clients do NOT inactivate noteforms they have not tested, because this would limit the noteforms that are pulled into the note for symptom or problem-based forms.
 +
 +
*Normally, the process is that the standard note forms are installed in both test and production.  The organization then reviews the noteforms they will be defaulting into note templates and decides if they need to create new noteforms.  The organization then moves the note templates they decided to use AND the noteforms tweaked and/or created into production.

Revision as of 19:33, 23 February 2012

Brief steps to create an Allscripts Enterprise EHR v11 Note:

  • Create Visit Type & Sub-Type
  • Validate Specialty & Sub-specialty
  • Validate all needed Note Sections exist, add as needed
  • Validate Symptom details with existing content or create new
  • Validate Text Templates with existing content or create new
  • Validate Note Form details with existing content or create new
  • Create a Note Input Template
  • Associate Input Template to desired Output Template(s)
  • Create Print Template as desired in Document Admin
  • Setup AutoPrint Defaults as desired

V11.2 Note Changes

Changes to v11.2. Note

FAQ

Q: Is it best practice to bring over all noteforms and note templates from Test to Live or is it best practice to bring over only those note templates and NoteForms that have been tested and the organization has decided to use?

  • Only move from Test to Production those note templates the organization will be using and those noteforms the organization may have tweaked and put inside those note templates.
  • However the base install of all the noteforms should be installed in Production. Typically clients do NOT inactivate noteforms they have not tested, because this would limit the noteforms that are pulled into the note for symptom or problem-based forms.
  • Normally, the process is that the standard note forms are installed in both test and production. The organization then reviews the noteforms they will be defaulting into note templates and decides if they need to create new noteforms. The organization then moves the note templates they decided to use AND the noteforms tweaked and/or created into production.